With Inaugurating of first solar system project in Daikundi, 48 hectares of land irrigated

mail-admin
پنجشنبه ۱۴۰۰/۴/۱۰ - ۱۱:۲
With Inaugurating of first solar system project in Daikundi, 48 hectares of land irrigated

Saratan 10: July 1, 2021
The first solar system of Helmand Sea system in Miramur district of Daikundi province has been exploited and 48 hectares of land has been irrigated.
This project has been implemented with the assistance of Aga Khan Foundation (AKF), under supervision of Daikundi Agriculture Directorate on Helmand Sea in Miramur district. Provincial directorate says, “Using the system, 450 meters long and 200 meters high, water is transferred from Helmand Sea to farms and 48 hectares of land have been irrigated.”
The cost of this project will reach one million 413 thousand and 899 AFN,  57 families will benefit from it.

تازه ترین اخبار

سه‌شنبه ۱۴۰۴/۱۲/۵ - ۱۲:۵۹
Background image

د کندهار نېش ولسوالی کې د ۲.۹ میلیونه افغانیو په لګښت چکډېم ګټې اخیستنې ته وسپارل شو

۵ کب ۱۴۰۴ه‍.ش
۷ رَمَضانُ المُبارَک ۱۴۴۷ه‍.ق 
د کرنې، اوبولګولو او مالدارۍ وزارت د پراختیایي بودیجې له لارې، د کندهار د کرنې، اوبو لګولو او مالدارۍ ریاست تر رهبرۍ لاندې او د قدرتي سرچینو. . .

سه‌شنبه ۱۴۰۴/۱۲/۵ - ۱۰:۲۲
Background image

د میدان وردګو ولایت کرنې ریاست کې د شنو خونو د جوړولو کار پیل شو

۵ کب ۱۴۰۴ه‍.ش
۷ رَمَضانُ المُبارَک ۱۴۴۷ه‍.ق 
د میدان وردګو ولایت د کرنې، اوبولګولو او مالدارۍ ریاست د معلوماتو له مخې، د میدان وردګو ولایت د کرنې په ریاست کې د شنو خونو د جوړولو چارې. . .

سه‌شنبه ۱۴۰۴/۱۲/۵ - ۱۰:۸
Background image

ننګرهار کې د کرنې او مالدارۍ په بېلا بېلو برخو کې پروژې پلي کېږي

۵ کب ۱۴۰۴ه‍.ش
۷ رَمَضانُ المُبارَک ۱۴۴۷ه‍.ق
د ننګرهار د کرنې، اوبو لګولو او مالدارۍ رییس مولوي عبدالستار محمد د خپل کار په دفتر کې د ملګرو ملتونو او د خوړو او کرنې ادارې «اف‌اې‌او» د. . .

بازگشت